Roadworks,
Underground Utilities

Agassiz RV Campground Construction

Project Details

Location: Agassiz, BC
Client: Private Owner
Category: Roadworks, Underground Utilities,
Scope: The construction of a 32-Lot RV Park included a septic chamber and two disposal fields, along with 150mm Sanitary main, 50mm HDPE watermain, 50mm communication duct, direct bury power cable, and complete road restoration

Involved from Initial Design to Final Execution

J. Cote has been heavily involved in the design stages, helping our private developer with proactive and cost-effective solutions for every unseen situation.

Drainage Solutions for Seasonal Flooding

Given the location of the RV Campground in the BC Fraser Valley, the surrounding area was prone to major flooding issues in the winter months, limiting its potential use.

Familiar with the area and the severity of the flooding issues, J.Cote proposed and executed a plan to increase drainage and raise the subgrade, ensuring year-round use to maximize profitability of the RV Campground.

J Cote icon

150mm Sanitary Main,
50mm HDPE Watermain

J Cote icon

50mm Communication Duct
with Direct Bury Power Cable

Environmental Construction,

Langley, BC

West Langley Park Culvert

Installation of 22 LM of 1800 box culvert in steep slope conditions with complex bypass pumping.